DMAIC does not change between sectors. The waste does. Pick your industry below and you will see one worked example, Define through to Control, with the numbers a manager in that sector would actually argue about.

10 industries · one method · no sign-in needed to read any of it

Healthcare Waiting is the waste you can see. It is rarely where the delay actually starts. See the example → Manufacturing OEE hides three losses. Only one of them is the machine's fault. See the example → Financial services Most of the lead time is a customer waiting for a document nobody asked for yet. See the example → Retail & e-commerce The late order is almost never the courier's fault. See the example → Logistics & distribution Trailers queue because the schedule was never designed, not because drivers are late. See the example → Public sector A case that passes through four teams waits four times. See the example → Education & students Marking is a queue, and queues at the end of term are predictable. See the example → Small business In a small business the bottleneck usually has the owner's name on it. See the example → Software & technology Big releases are the batch size problem wearing a different hat. See the example → Food & drink Giveaway and waste are the same problem measured at opposite ends. See the example →

Healthcare

Clinical & patient pathways

In healthcare the process is the patient pathway, and the cost of variation is measured in harm and in hours. DMAIC suits it because you can measure a pathway without blaming a person, and improve it without changing who does what.

Define

Emergency department breaches its four-hour target on 40% of weekday afternoons. Scope: adult walk-in pathway, triage to decision-to-admit.

Measure

Ninety days of timestamps for 1,240 arrivals: median triage-to-clinician 52 minutes, 90th percentile 118 minutes.

Analyse

A Pareto shows 68% of the delay sits in two steps only: the triage queue and the bed-allocation handover between teams.

Improve

Split triage into a fast-track stream for minor injuries, add standard work for bed allocation, pilot across six shifts before scaling.

Control

Daily huddle reviews median and 90th percentile on a control chart, with a written reaction plan when a point lands above two sigma.

Metrics that move

Triage-to-clinician time 90th percentile wait Decision-to-admit Did-not-attend rate Bed turnaround

Watch: DMAIC in Hospital Operations

Open the full healthcare hub → Lean Six Sigma for healthcare →

Manufacturing

Production & assembly

Manufacturing is where most Lean Six Sigma tools were written, which makes it easy to reach for a tool before you know the problem. DMAIC keeps you honest: measure availability, performance and quality separately before anyone touches the line.

Define

Line 3 runs at 61% OEE against a 75% target and produces £14,000 of scrap a month. Scope: one line, one product family, twelve weeks.

Measure

Six weeks of OEE split into availability, performance and quality, plus every changeover timed with a stopwatch and video.

Analyse

Changeover analysis shows 41% of internal time is spent hunting for tooling. Scrap fishbone points at one fixture and two untrained operators.

Improve

Externalise setup steps, build a shadow board, pre-stage kits, 5S the tooling area, retrain on the fixture and standardise the work.

Control

OEE board updated every shift, changeover minutes written on the line whiteboard, standard-work audit weekly, reaction plan for two missed shifts.

Metrics that move

OEE Scrap rate Changeover time First pass yield Mean time between stops

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Lean Six Sigma for manufacturing →

Financial services

Banking & insurance

In financial services the work is a case moving through handoffs, and the lead time is mostly queue time. Regulation sets the rules of the process, so the improvement work is almost always about removing waits and rework, not removing controls.

Define

Mortgage applications take 34 days against an 18-day service commitment, and complaints are rising. Scope: application to offer.

Measure

Timestamped stages for 200 cases, from submission to offer, plus a rework log kept by the processing team.

Analyse

The value stream map shows 62% of lead time is waiting for documents and 23% of files are reworked for missing information.

Improve

A document checklist at submission, parallel underwriting instead of sequential, and automatic status updates so customers stop chasing.

Control

Weekly value stream review, work-in-progress limits per underwriter, cycle-time control chart per product.

Metrics that move

Application cycle time Rework rate Right-first-time documents Queue age Complaints per 1,000

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Lean Six Sigma for financial services →

Retail & e-commerce

Stores & fulfilment

Retail measures everything at the till and almost nothing between the click and the van. DMAIC gives you the middle of that journey: where orders wait, where stock is wrong, and where a small fix removes most of the failures.

Define

9.4% of online orders arrive later than promised and returns are eating margin. Scope: order placed to dispatch, single warehouse.

Measure

Pick, pack and dispatch timestamps for 3,000 orders, plus stock-accuracy checks on the top 100 lines.

Analyse

71% of late orders share one cause: they are picked after the 15:00 cut-off because the picker could not find the stock.

Improve

Slot picking by zone, cycle counting on the fifty fastest movers, and re-slotting so the top sellers sit nearest the packing bench.

Control

A 15:00 dispatch board, a daily late-order Pareto, and a weekly stock-accuracy check with an owner named for each zone.

Metrics that move

On-time dispatch Order cycle time Stock accuracy Return rate Picks per hour

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Free calculators for the numbers →

Logistics & distribution

Warehousing & transport

Logistics is a flow problem with a clock attached. The improvement is usually in the booking pattern and the dock, not in asking people to hurry: a trailer that waits for a free dock has been failed by the schedule.

Define

Trailer turnaround at the distribution centre averages 96 minutes against a 45-minute target. Scope: gate-in to gate-out.

Measure

Gate and dock timestamps for four weeks, by carrier, by hour of arrival.

Analyse

55% of dwell is waiting for a free dock, and arrivals bunch between 06:00 and 09:00 because slots are unmanaged.

Improve

Booked arrival slots, cross-docking for the 20% of volume that never needs storing, and a written dock allocation rule.

Control

Dock schedule adherence tracked daily, exception review each morning, and turnaround time on a control chart by carrier.

Metrics that move

Trailer turnaround Dock utilisation On-time delivery Cost per drop Dwell time

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Pareto chart for logistics →

Public sector

Councils & public services

Public services rarely control demand, so improvement work focuses on the parts they do control: intake quality, handoffs and the age of the backlog. DMAIC works well here because it makes the queue visible without blaming the frontline.

Define

Resident enquiries take 22 working days against a 10-day commitment. Scope: one service, one enquiry type, six months of cases.

Measure

Case management timestamps for every stage, plus a count of how often a case changes team.

Analyse

31% of cases need rework because the original request was incomplete, and the average case changes hands four times.

Improve

Triage at intake with a fixed question set, standard response templates, and one named owner per case instead of a team queue.

Control

Weekly backlog review by age, escalation at day seven, and a monthly report of the oldest 20 open cases.

Metrics that move

Days to resolve Backlog age Cases per owner Rework rate First-contact resolution

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Ask about sector training →

Education & students

Schools, colleges & universities

Education has the same physics as any other process: work arrives in batches, waits in queues and gets reworked. Students feel the wait as feedback delay, which is exactly the thing that makes the learning stick less.

Define

Assignment feedback takes 18 days against a 10-day commitment, and satisfaction with feedback is falling.

Measure

Submission-to-feedback timestamps per module, plus a sample of feedback that had to be redone.

Analyse

The bottleneck is batch marking at the end of term; marking queues behind moderation, not behind marking itself.

Improve

Fixed marking windows, a shared rubric so moderation is quicker, and staggered deadlines across modules.

Control

A marking tracker visible to the whole team, a weekly at-risk list, and a target for the percentage returned in ten days.

Metrics that move

Feedback turnaround On-time submission Moderation queue Student satisfaction Resubmission rate

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Lean Six Sigma for students →

Small business

Owner-run & under 50 staff

You do not need a black belt to fix a five-person process, but you do need to know which step is actually holding everything up. DMAIC scaled down is a fortnight of attention, not a programme.

Define

Quotes take five days to reach the customer and around 30% of enquiries go cold in that time. Scope: enquiry to quote sent.

Measure

An enquiry log for eight weeks with a timestamp for each stage, kept by whoever touches the enquiry.

Analyse

70% of the delay is waiting on supplier pricing and on the owner's approval, both of which happen in batches.

Improve

Template quotes with pre-agreed pricing, a delegated approval limit for standard work, and one supplier price list in one place.

Control

A weekly pipeline review, a list of quotes older than two days, and a target of 90% of quotes out within 48 hours.

Metrics that move

Quote turnaround Conversion rate Enquiry response time Rework hours Cash conversion

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Lean Six Sigma for small business →

Software & technology

Product & engineering teams

Software teams already collect the data. What they often miss is that lead time is a queueing problem, so the fix is smaller batches and fewer handoffs, not more effort at the end.

Define

22% of releases need a hotfix and lead time from commit to production is nine days. Scope: one service, one quarter.

Measure

Lead time per change, deployment frequency, change failure rate and time to restore, measured from the pipeline itself.

Analyse

60% of escaped defects come from one service with no automated tests on its critical path, and releases ship in large batches.

Improve

Smaller releases, automated tests on the hot path, and a definition of done that includes a rollback plan.

Control

The four delivery metrics on a dashboard reviewed weekly, a release readiness checklist, and a blameless review after every hotfix.

Metrics that move

Lead time Deployment frequency Change failure rate Time to restore Escaped defects

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

AI for quality management →

Food & drink

Kitchens & production

In food, variation costs twice: you pay for what you give away and again for what you throw away. Portion control and prep scheduling are small, measurable changes with immediate cash impact.

Define

Portion giveaway runs at 6.8% and waste at 4.1% of food cost. Scope: one kitchen, one menu cycle.

Measure

Weigh-back data for a fortnight, waste logs by category, and portion weights sampled across staff and shifts.

Analyse

Portion variance comes from having no standard tool, and waste peaks where prep is done in batches for a demand that never arrives.

Improve

Standard portion tools, a cook-to-demand prep schedule, and daily specials that use stock already at risk.

Control

A daily waste log reviewed at the morning briefing, weekly portion sampling, and food cost variance on the management report.

Metrics that move

Food cost % Waste % Portion variance Prep-to-sales ratio Ticket time

Vote for a video on this industry

Nine industries are waiting to be filmed. We shoot them in the order you vote for, so the one you need most is the one you get first.

0 votes so far

Free tools and calculators →

Common questions

Straight answers, whichever sector you are in

The same five questions come up from every industry. These are the honest answers, without the sales pitch.

How does continuous improvement actually work in my industry?

The five phases stay the same, only the process and the numbers change. Pick one process you can name and measure: a patient pathway in healthcare, one line and one product family in manufacturing, an application in financial services, a dock in logistics, a fulfilment route in retail, a case in the public sector, a marking cycle in education, a quote in a small business, a release in software, a prep shift in food and drink. Collect 30 to 90 days of one number the team already argues about, find where the delay or the defects concentrate, change one step, then hold the gain with a chart and a written reaction plan. It works when the scope is one process, the measure is one number, and the change is tested on a small scale before it is rolled out.

Which tools should I use for the problems I face?

Match the tool to the problem. If work waits in queues, use a value stream map or a SIPOC and measure takt and cycle time. If output is inconsistent, use control charts, capability and standard work. If the same failure keeps coming back, use a Pareto to find the biggest cause, then a fishbone and 5 Whys to explain it. If you need to choose what to fix first, use a Pareto and the cost of poor quality. Changeover and setup problems are SMED; workplace organisation is 5S. And if you cannot yet state the problem as a measurable gap, the right first tool is a one page project charter, not a calculator. All of them are free on this site: 80 templates and 25+ calculators.

What does good practice look like in my working environment?

Good practice is boring and visible. A named owner for the process, a standard that people actually follow, one measure displayed where the work happens, and a short daily or weekly review that acts on it. On a ward that is a board showing waits and escalations; on a line it is OEE and changeover minutes on the shift board; in an office it is a limit on work in progress and a queue you can see; in a kitchen it is waste and portion variance logged daily. Two tests tell you whether it is real: could a new starter run the process from the standard, and would a bad day show up on the chart before a customer complains?

How can I improve things without spending thousands?

Most first gains are free because they change the order of work rather than buying equipment. The reliable sequence is: 5S the area, remove a double handling by moving one step, standardise the version people actually use, cap work in progress so queues stop growing, and stage materials before a changeover. Measure one number before and after, such as lead time, first pass yield or on time delivery. Capital comes later, and only once the process is stable enough for equipment to pay back. A zero cost change that saves two hours a week beats a system nobody uses, and it gives you the evidence to ask for money afterwards.

How can I get my team involved and demonstrate measurable results?

Involve the people who do the work in the measuring, not just the change. Start with a one page charter stating the problem, the baseline and the target, then ask the team to collect the data for two weeks; they will find the real cause faster than any analysis done to them. Run the change as a short pilot with a named owner, and show the result where the work happens: before, after, and what happens if the number slips. Name the people who found the cause rather than paying for it. A project that moves one measure from one number to another and holds it for eight weeks is the strongest evidence you can put in front of a manager.

Council for Six Sigma Certification seal

Where to go next

Every example on this page is the kind of project the Academy teaches properly, phase by phase, with the tools and the maths behind each one. If you want the method itself rather than the examples, the Green Belt is the one people ask us about most.

The Council for Six Sigma Certification seal sits on our Lean Six Sigma belt courses.