Patient pathway map
Map triage to discharge in one pass, with owners, decision points and the gaps named.
Open the process map generator →Pathways, waiting times, discharge, handover and the incidents that keep coming back. Everything below is written for healthcare teams: the tools, the numbers to watch, and the first three steps for whoever owns the process.
Six tools that already exist on this site, chosen for the problems healthcare teams actually bring: a pathway that needs mapping, a wait that needs measuring, a discharge that keeps slipping.
Map triage to discharge in one pass, with owners, decision points and the gaps named.
Open the process map generator →
Turn referral and appointment timestamps into median and 90th percentile waits, by pathway.
Open the waiting-time calculator →
Eight checks to run the moment a discharge slips, so the real blocker gets named.
Standardise what is said, by whom, in what order, at every shift handover.
Open the handover checklist →
Problem, baseline, target, team and timeline on one page. Stops a project drifting.
Open the project charter template → Or have one written from your own notes →
Capture the numbers before you change anything, so the result is not a guess.
Open the baseline metrics template →One story, told the whole way through in the order we always tell it. The hospital here is made up, the method is not, and you can follow every step with your own numbers.
This illustrative example walks through the full improvement method: the problem, baseline, analysis, intervention, results and controls.
A district general hospital, adult walk-in pathway, 1,240 arrivals over 90 days. One improvement lead, no dedicated analysts.
The four-hour target was breached on 40% of weekday afternoons, and nobody could agree where the delay actually started.
Median triage-to-clinician 52 minutes, 90th percentile 118 minutes. Timestamps pulled from the patient record system.
A Pareto put 68% of the delay into two steps only: the triage queue and the bed-allocation handover. A value stream map showed 41% of the handover time was bleep-and-wait.
A fast-track stream for minor injuries, standard work for bed allocation, one named bed coordinator per shift. Piloted across six shifts before any policy changed.
Median 52 to 31 minutes. 90th percentile 118 to 74 minutes. Breaches 40% to 18%. Held for eight weeks before scaling.
A daily huddle reads median and 90th percentile off a control chart, with a written reaction plan when a point lands above two sigma.
Measure the handover, not just the queue. Name one owner per blocker. Pilot before policy, and keep the chart on the wall where the work happens.
The numbers are realistic for a district general hospital, but this one is here to show the method rather than to report a client result. If you have a project of your own you would not mind seeing written up, email [email protected].
The same five phases moving on a hospital pathway, rather than described on a page.
Watch: DMAIC in Hospital Operations. If you would rather read the same walkthrough, the worked example above follows the identical order: problem, baseline, analysis, intervention, results and controls.
Most people know something is going wrong but not whether they need a process map, a Pareto or a control chart. Pick the problem you actually have, and you get a finished example of it as well as the plan.
Waiting is usually a queue or a handover, not a shortage of staff. Measure both before you add capacity.
Example, worked through
Sixty referrals a week from A&E, and the ward sister was asked why patients were waiting in the corridor.
Four weeks of request-to-bed timestamps from the bed manager's sheet: median 3h 10m, 90th percentile 7h 40m. A Pareto put 38% of the delay on cleaning sign-off.
One named cleaner per shift, a 30-minute handover slot written on the ward board, and the bed manager calling the cleaner directly instead of going through the site office.
Median 3h 10m to 1h 50m, 90th percentile 7h 40m to 4h 20m, held for six weeks before the second ward copied it.
What they did next: a control chart on the ward board, read at the 08:30 huddle, with a written reaction plan for any week the median goes back over two hours.
Illustrative example, not a client result.
Your starter plan
Starter plan: patient waits 1. Pick one pathway: adult walk-in, or one outpatient clinic. 2. Collect 30 days of timestamps: arrival, triage, clinician, decision, departure. 3. Calculate median and 90th percentile for each step. 4. Pareto the steps to find the two that hold most of the wait. 5. Time the handover between teams for 10 cases. 6. Charter one change, pilot it for two weeks, keep the chart visible. Measure: median and 90th percentile wait, before and after.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
A slipped discharge is nearly always a dependency, not a clinical decision. List the dependencies and you can see which one fails most.
Example, worked through
Twelve discharges a day, and the beds they freed were not available until late afternoon.
Three weeks of comparing when each discharge was clinically ready with when the bed was actually free: median gap 4h 05m, worst case 9h.
Expected discharge date written on the board at admission, pharmacy review moved to the day before, and transport booked the day before rather than on the day.
Beds free before noon went from 3 in 10 to 7 in 10, and the median gap from 4h 05m to 1h 15m.
What they did next: discharged-before-noon read weekly at the ward meeting, and the checklist re-run whenever a new registrar joins.
Illustrative example, not a client result.
Your starter plan
Starter plan: discharge delays 1. Take the last 20 discharges that slipped past their date. 2. For each, name the dependency that failed: TTOs, transport, therapy, social care, follow-up, equipment. 3. Pareto the failures. Two will dominate. 4. Fix the biggest one with a named owner and a standard step. 5. Track decision-to-discharge hours and the % discharged before noon. Measure: hours from decision to departure, weekly.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
Recurring incidents are a control problem. The cause is usually known, and the standard or the check is missing.
Example, worked through
The governance lead could see every report but not what kept causing them.
Six months of reports grouped by theme: 31% of falls at the same three bed spaces, 22% of medication delays all in the 14:00 drug round.
Moved the two highest-risk patients out of the unobserved bay, split the 14:00 round across two nurses, and wrote a one-page standard for handing over delayed medicines.
Falls in those bays from 9 to 2 a month, medication delays from 20 to 6, over three months.
What they did next: themes reviewed monthly by the ward manager, one action per theme, an owner named in the minutes.
Illustrative example, not a client result.
Your starter plan
Starter plan: recurring incidents 1. Take the last 12 months of incidents in one theme. 2. Group them by where in the process they happened. 3. For the largest group, run a fishbone with the team that does the work. 4. Five whys until you reach a missing or unclear standard. 5. Add the check, assign the owner, review at 30 days. Measure: incidents per 1,000 bed days for that theme.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
Firefighting is usually clutter, unclear standards and work arriving in batches. All three are fixable without money.
Example, worked through
Most of the day went on answering the phone and rebooking appointments, so nothing planned ever got done.
One week of time logged in 15-minute blocks: 21 hours on the phone, 9 of them rebooking.
Online booking for routine appointments, a text reminder 48 hours before, and one hour a day of protected admin time with the phone diverted.
Rebooking calls from 60 to 18 a week, and 5 hours a week back for recall and audit work.
What they did next: a monthly count of calls by reason, so the next biggest reason gets the same treatment.
Illustrative example, not a client result.
Your starter plan
Starter plan: firefighting 1. Spend 30 minutes in the area at the busiest time, observing only. 2. Photograph what is out of place and list the interruptions you see. 3. Ask the team for their top three interruptions. 4. Remove the biggest one for a week: move the stock, change the batching, add the standard. 5. Start a 15-minute huddle with one number on the board. Measure: interruptions per shift, and time spent on value-adding work.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
Complaints are a sample of a process. Read them as data and the same two or three causes appear again and again.
Example, worked through
Comments arrived every month, were read, and nothing changed because nobody could see the pattern.
Three months of comments grouped by theme: 34% about getting through on the phone, 21% about appointment times.
A call-back option instead of holding, two early-morning slots released each day, and a one-line reply to every comment left.
Phone complaints down by half in two months, and the Friends and Family score up from 76% to 84%.
What they did next: themes read monthly, the top one given a named owner and a 30-day review.
Illustrative example, not a client result.
Your starter plan
Starter plan: patient feedback 1. Export the last 100 comments or complaints with names removed. 2. Read them and write one theme per comment. 3. Count the themes and Pareto them. 4. Take the top theme and map the journey that produced it. 5. Change one step, then re-count the same theme next month. Measure: complaints per 1,000 patients for that theme.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
What each measure means, how to calculate it, a worked example and the pitfall that catches most teams. No published benchmarks: compare your own pathway before and after instead.
Record the start and end event for each waiting-time measure. If you are reporting a four-hour target alongside triage-to-clinician waiting time, show them as separate measures.
Average days a patient occupies a bed for one episode of care, and the tail above it.
Worked example: 1,240 bed days / 200 discharges = 6.2 days average.
The average hides the tail. Report the median and the 90th percentile, and split by pathway: the long-stay tail usually drives most of the bed days.
How long patients wait between two named events, such as triage to clinician, referral to treatment, or arrival to decision to admit. Always state both events, because each pair of events is a different clock.
Worked example: Triage to clinician: median 52 min, 90th percentile 118 min across 1,240 arrivals. Arrival to decision to admit is a separate clock: 75% within four hours. The two are not comparable, so report them apart.
A single percentage hides where the wait sits. Measure each step on its own clock, otherwise you improve the queue and not the handover.
The share of available beds occupied, used as a flow and safety indicator.
Worked example: 1,240 occupied of 1,320 available = 94%.
Chasing 100% is unsafe. Above roughly 85 to 90% there is no slack, so any delay becomes a corridor wait. Track it with length of stay, not alone.
Unplanned emergency admissions within 30 days of discharge, as a share of discharges. Planned returns are excluded and counted separately: a booked procedure, a staged operation or planned rehabilitation.
Worked example: 21 unplanned of 250 discharges = 8.4%. The 9 planned returns in the same period are reported separately and never added in.
Case mix and deprivation drive this, so never compare raw rates across different populations. Compare your own pathway before and after.
The share of discharges that leave the ward before midday, which frees beds when they are needed.
Worked example: 55 of 250 discharges = 22%.
It can be gamed by reclassifying or delaying the record. Pair it with decision-to-discharge hours so the clock starts when the clinical decision is made.
Most healthcare teams have no improvement department. These are the first sensible steps for the person who owns performance but not the methodology.
Four real improvement tasks. Tell us your situation and we will write the prompt for you, ready to paste into your own AI tool, with the limits and the human check spelled out. Never paste anything that identifies a patient.
Input: 50 to 200 free-text incident descriptions, with names, staff IDs and record numbers removed.
Output: 6 to 8 themes, the count in each, and two example descriptions per theme.
Your prompt
Limits: it cannot judge clinical severity, and it may merge two different causes into one theme. A clinician must review every theme and the mapping.
You are helping a healthcare improvement team analyse incident descriptions. I will paste anonymised descriptions, one per line. Group them into no more than 8 themes. For each theme give: a short name, the count, and two example descriptions (lightly edited to remove anything identifying). Do not speculate about clinical causes or blame individuals. End with the three themes most likely to be a process problem rather than a people problem, and say why.
Input: an approved, redacted extract of your discharge policy, with names and record numbers removed.
Output: a 12-step checklist in the order the work happens, with an owner for each step.
Your prompt
Limits: it will not know your local exceptions, and it may tidy away a step that matters. Matron, pharmacy and therapy sign-off before use.
Here is our discharge policy. Turn it into a 12-step checklist a ward nurse can use at the bedside. For each step give: the action, who owns it, and when it must be done (on admission, day before, morning of discharge). Keep our wording where it is specific. Flag any step where the policy is ambiguous rather than inventing a rule.
Input: anonymised comments from friends and family tests or complaints.
Output: themes with counts, approximate sentiment, and representative quotes.
Your prompt
Limits: sentiment is approximate and sarcasm defeats it. Read 20 raw comments yourself before acting on any theme.
Here are anonymised patient comments, one per line. Group them into themes, count each theme, and for each give the sentiment as positive, negative or mixed, plus one representative quote copied exactly. Do not invent quotes. Do not combine two comments into one. Finish with the three themes that would move the score most if fixed.
Input: rough notes from a daily huddle, typed as you go.
Output: a table of actions, owners and dates, plus anything unresolved.
Your prompt
Limits: it will invent an owner if you let it, so the instruction above matters. Read the log back at the next huddle.
Here are my rough notes from a ward huddle. Turn them into an action log: action, owner, due date, and status. Only use owners and dates that appear in the notes. If an owner or date is missing, write NEEDS OWNER or NEEDS DATE rather than guessing. List separately anything that was raised but not decided.
Three things that come up every time a ward or practice starts improving something.
No. The strongest first step in most healthcare teams is one pathway, one measure and a two-week pilot run by the person who owns the process. A White Belt or Yellow Belt gives a ward manager enough to run that safely, and a Green Belt is the right level when the change crosses teams or needs a proper baseline and control chart. Nothing on this page needs a consultant or a licence.
Start where two things are true: the team already complains about it, and you can get 30 days of timestamps. Waits, discharge delays and recurring incidents usually qualify. Avoid starting with a problem that needs capital, a new system or a whole-organisation restructure, because the first project should produce a visible win in weeks rather than quarters.
For a single pathway with clean data, a measurable shift in the median is common within four to six weeks, and the 90th percentile usually follows as the tail is dealt with. What takes longer is holding it: plan for a daily or weekly review and a written reaction plan, or the process drifts back within a couple of months.
The White Belt is free and takes an afternoon. The Green Belt is the level to aim for if you are going to run a pathway project with a baseline, a pilot and a control chart.