Goods-in to despatch map
Map one flow from arrival to departure, with every bay, queue and handoff named.
Open the process map generator →Late deliveries, trailers waiting at a bay, damage nobody admits to, and a fleet that looks busy all day without moving the numbers. Everything below is written for logistics and distribution teams: the tools, the numbers to watch, and the first three steps for whoever owns the route.
Six tools that already exist on this site, chosen for the problems depots and transport teams actually bring: a flow that needs mapping, a dwell time that needs measuring, a bay that is always blocked.
Map one flow from arrival to departure, with every bay, queue and handoff named.
Open the process map generator →
Turn arrival and departure timestamps into loading time, waiting time and the true cost of a blocked bay.
Open the lead time calculator →
Eight checks to run before the doors close, so a late departure is caught at the bay, not at the gate.
Standardise what travels with a route so the depot is not phoned three times a shift.
Open the handover checklist →
Plot on-time delivery weekly and see the shift, not a monthly average that hides the bad week.
Open the run chart template →
Problem, baseline, target, team and timeline on one page. Stops a project drifting.
Open the project charter template → Or have one written from your own notes →One story, told the whole way through in the order we always tell it. The depot here is made up, the method is not, and you can follow every step with your own numbers.
This illustrative example walks through the full improvement method: the problem, baseline, analysis, intervention, results and controls.
A regional depot running 46 vehicles a day, 12 loading bays and two shifts, with no dedicated improvement resource.
On-time delivery sat at 87% and the depot blamed traffic. Customers were told the same thing every week, and the transport manager suspected the problem started before the vehicle left.
Four weeks of data: on-time in full 87.2%, average trailer dwell 3h 20m, damaged-on-arrival claims 14 a week, vehicles per bay 4.1.
Timestamps showed 61% of late deliveries came from routes that departed more than 40 minutes after plan. A time study found 44% of trailer dwell was waiting for paperwork or a bay, and 9 of the 14 weekly damage claims were loads that had been reworked at the bay.
Paperwork moved to pre-arrival for the top 20 customers, a bay allocation board visible from the yard, load sequence printed with the route sheet, and a gate log for actual departure times.
On-time in full 87.2% to 95.6%. Average dwell 3h 20m to 1h 55m. Damage claims 14 to 4 a week, and two vehicles were freed from the peak by the faster turnaround.
A daily 07:30 review of yesterday's departures against plan, a weekly run chart of on-time in full, and a written reaction plan when two days in a row miss.
The depot was fixing traffic it could not control while its own departure times were the real driver. Log the actual gate time and the argument changes.
The numbers are realistic for a depot of this size, but this one is here to show the method rather than to report a client result. If you have a project of your own you would not mind seeing written up, email [email protected].
The same five phases moving on a depot flow, rather than described on a page.
Video walkthrough
We have not created the logistics walkthrough yet. We create the industry videos in the order you vote for, so the one you need most is the one you get first.
Most depots know deliveries are late but not whether they need a bay redesign, a paperwork fix or a route plan. Pick the problem you actually have, and you get a finished example of it as well as the plan.
Late arrival is usually a late departure, and a late departure is usually a bay, paperwork or load sequence problem inside your own gate.
Example, worked through
A depot was running at 87% on-time delivery and blaming traffic on the ring road, which nobody could change.
Four weeks of planned versus actual departures: 61% of late deliveries came from routes that left more than 40 minutes late, mostly the 07:00 group.
Paperwork moved to pre-arrival for the top 20 customers, a bay allocation board visible from the yard, and loads sequenced in delivery order.
On-time in full 87.2% to 95.6%, average dwell 3h 20m to 1h 55m, and the 07:00 group left within 10 minutes of plan.
What they did next: a daily 07:30 departure review and a weekly run chart, with a reaction plan when two days in a row miss.
Illustrative example, not a client result.
Your starter plan
LOGISTICS STARTER PLAN: deliveries arrive late 1. Pick one depot, one customer group, four weeks. Define on time in full precisely. 2. Compare planned departure with actual gate-out for every route. 3. Find what late departures share: customer, lane, bay, shift, paperwork. 4. Fix the shared cause at the bay: pre-arrival paperwork, slot booking, load sequence. 5. Re-measure departure against plan for four weeks. 6. Then measure arrival against the customer window, not the plan. 7. Hold it with a daily departure review and a weekly chart. 8. Then the next cause. Do not chase traffic you do not control.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
A waiting trailer is capacity you already paid for. The wait is almost always paperwork, bay allocation or a load that has to be rebuilt.
Example, worked through
A depot was paying overtime and hiring agency drivers while twelve bays looked permanently full.
Two weeks of gate logs: median dwell 3h 20m, of which 44% was waiting for paperwork or a free bay, and 9 visits a day were re-loads.
Pre-arrival document checks for the top 20 customers, a bay board with live allocation, and a rule that a re-load gets a bay within 20 minutes.
Median dwell 3h 20m to 1h 55m, vehicles per bay 3.8 to 4.6, and the agency shift cancelled.
What they did next: a weekly dwell review by reason code, with the top reason owned by the transport planner.
Illustrative example, not a client result.
Your starter plan
LOGISTICS STARTER PLAN: trailers wait at the bay 1. Log gate-in and gate-out for two weeks, with a reason code for every wait over 20 minutes. 2. Split dwell into waiting, loading, paperwork and rework. 3. Rank the waits by total minutes lost across the week. 4. Remove the biggest one: pre-arrival paperwork, a slot booking rule, or a bay allocation board. 5. Re-measure dwell the same way for two weeks. 6. Check whether the freed capacity removes overtime or agency cover. 7. Hold it with a weekly reason-code review and a named owner. 8. Then the next wait, one at a time.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
Damage is a handling defect. Where it happened and who handled it last tells you more than any photograph of a crushed box.
Example, worked through
A depot had 14 damage claims a week and treated them as a carrier problem, paying them without investigation.
Six weeks of claims: 64% came from loads rebuilt at the bay after a short pick, and the rebuilds were stacked in the order things were found, not by weight.
A rebuild rule: heavy at the bottom, nothing above shoulder height, and a photo at the bay for any rebuilt load. Short picks flagged to the customer before departure.
Claims 14 to 4 a week, and rebuilt loads fell by 70% once the short pick was caught before loading.
What they did next: a monthly claims review by cause, with the top cause owned by the shift supervisor rather than the carrier.
Illustrative example, not a client result.
Your starter plan
LOGISTICS STARTER PLAN: goods arrive damaged 1. Log every claim for six weeks: what, where found, who handled it last, was it rebuilt. 2. Rank by count and by cost. Rebuilt loads usually lead. 3. Watch one rebuild at the bay and write down what actually happens. 4. Fix the handling rule: weight order, height limit, a photo, a second check. 5. Stop the short pick at source so the rebuild does not happen at all. 6. Re-measure claims per 1,000 deliveries for six weeks. 7. Hold it with a monthly review and a named owner per cause. 8. Then the next cause, with the same discipline.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
Busy is not the same as productive. Empty running and waiting time are both invisible in a utilisation figure that counts vehicles in motion.
Example, worked through
A transport manager was asked to justify the fleet size, and the utilisation report said the vehicles were almost always in use.
Four weeks of telematics and job data: 18% of miles were empty, concentrated on three lanes where the return leg was always run without a load.
A backload board checked at 14:00 daily, a minimum rate per mile for backloads, and one lane re-timed so the return leg could collect from a second customer.
Empty running 18% to 11%, revenue per mile up 9%, and the fleet reduction question answered without selling a vehicle.
What they did next: a weekly empty-running report by lane, with the planner accountable for backload coverage.
Illustrative example, not a client result.
Your starter plan
LOGISTICS STARTER PLAN: the fleet looks busy but costs more 1. Measure loaded miles and total miles for four weeks. Empty running is the difference. 2. Split it by lane, by day and by customer. 3. Find the lanes that always run empty and ask why: timing, rate, or nobody looking. 4. Set a minimum acceptable rate for a backload and a daily time to look for one. 5. Re-time one lane so a return leg can collect. 6. Re-measure empty running and revenue per mile after four weeks. 7. Hold it with a weekly lane report and a named owner. 8. Then the next lane, not the whole network at once.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
A depot that copes on Tuesday and fails on Friday has a scheduling problem, not a capacity problem. Spreading the load is cheaper than buying bays.
Example, worked through
A depot ran 12 extra agency staff every Thursday and still missed departures, and the answer was always more bays.
Four weeks of arrival times: 38% of weekly volume arrived between 06:00 and 09:00 on a Thursday, against a bay capacity of about 22% of volume.
Slot booking with a discount for afternoon arrivals, two customers moved to Wednesday, and a bay reserved for late arrivals.
Peak hour arrivals 38% to 24% of volume, Thursday dwell down 35%, and the agency shift cut to four staff.
What they did next: a monthly slot adherence report and a peak-day dry run before every seasonal peak.
Illustrative example, not a client result.
Your starter plan
LOGISTICS STARTER PLAN: peak days break the depot 1. Plot arrivals by hour for four weeks. Peak days are usually habits, not demand. 2. Compare the peak hour with bay capacity. That gap is the problem. 3. Offer slots away from the peak with a real incentive, not a request. 4. Move two or three regular customers first. A pilot beats a policy. 5. Reserve capacity for late arrivals so a surprise does not block a bay. 6. Re-measure peak arrivals, dwell and departures after four weeks. 7. Hold it with a monthly slot adherence report. 8. Run a dry run before seasonal peaks and fix the first thing that breaks.
One click copies the plan and downloads the Excel and Google Sheets templates this problem needs, in a single zip.
What each measure means, how to calculate it, a worked example and the pitfall that catches most teams. No published benchmarks: compare your own operation before and after instead.
Define the clock before comparing results. On-time delivery can mean on the planned day, within the booked slot, or within a two-hour window, and a depot can pass one measure and fail another on the same day. Write down which one you report, and use the same one in every review.
The share of deliveries that arrive complete, within the agreed window, on the agreed day.
Worked example: 1,840 deliveries planned in a week, 1,759 on time and in full = 95.6%. A part delivery counts as a miss.
It can be improved by widening the window or by re-planning late routes. Freeze the promise for the measurement period and count a re-plan as a miss.
The time a vehicle spends at a site, from arrival at the gate to departure, split into waiting, loading and paperwork.
Worked example: 46 vehicles a day: median 1h 55m, 90th percentile 3h 30m. 44% of the median is waiting.
Measuring from the booking time rather than the gate makes the site look good and hides the queue. Use the gate, and split the wait from the work.
Throughput of a fixed asset: how many vehicle visits each bay completes in a shift.
Worked example: 46 visits across 12 bays in one day = 3.8 visits per bay, against a designed capacity of 5.
It rises if you count only planned visits or exclude rework at the bay. Count every visit, including re-loads, or the capacity story is fiction.
Claims or credits for goods damaged between the depot and the customer, per 1,000 deliveries.
Worked example: 14 claims across 1,840 deliveries = 7.6 per 1,000. Nine of the fourteen were loads reworked at the bay.
A rate per delivery hides whether the damage happened in loading, transit or unloading. Record where it was found and who handled it last.
The share of vehicle miles run without a revenue load.
Worked example: 8,400 empty miles of 61,000 total = 13.8%.
It improves by refusing awkward backloads that pay little, which can hurt margin. Read it beside revenue per mile, not alone.
Most depot teams have no improvement function. These are the first sensible steps for the person who owns service and cost but not the methodology.
Four real improvement tasks. Tell us your situation and we will write the prompt for you, ready to paste into your own AI tool, with the limits and the human check spelled out. Never paste anything that identifies a customer.
Input: 50 to 200 anonymised delivery exception notes, one per line.
Output: 6 to 8 causes, the count in each, and two example notes per cause.
Your prompt
Limits: it cannot see traffic or weather data, and it may merge distinct causes. A transport manager must review every group before anything changes.
You are helping a logistics team understand why deliveries fail. I will paste anonymised exception notes, one per line. Group them into no more than 8 causes. For each give: a short name, the count, and two example notes (lightly edited to remove anything identifying). Do not blame individual drivers or customers. End with the three causes most likely to be inside our own operation rather than on the road, and say why.
Input: an approved, redacted extract of the loading or despatch procedure.
Output: a 12-step checklist in the order the work happens, with an owner for each step.
Your prompt
Limits: it will not know your load security rules or local legislation. Transport manager sign-off before use, and the procedure stays the source of truth.
Here is our loading procedure. Turn it into a 12-step checklist a bay operative can use at the trailer. For each step give: the action, who owns it, and when it must be done. Keep our wording where it is specific, especially anything about load security or seals. Flag any step where the procedure is ambiguous rather than inventing a rule.
Input: anonymised damage claim notes, one per line.
Output: causes ranked by count, plus the claims that need more detail before they can be judged.
Your prompt
Limits: it cannot see photographs or judge whether a claim is valid. Treat the groups as hypotheses and check them against the physical evidence.
Here are our damage claim notes for the last six weeks, one per line. Group them into causes: loading, stacking, packaging, transit, unloading, or unknown. For each give the count and two examples. List separately any claim where the note is too thin to judge, and what detail would settle it. Finish with the two causes worth fixing first and one question to ask the bay team about each.
Input: rough notes from a depot huddle, typed as you go.
Output: a table of actions, owners and times, plus anything that threatens a departure.
Your prompt
Limits: it will invent an owner if you let it. Read the log back before the first vehicle leaves, and keep customer details out of the notes.
Here are my rough notes from a depot huddle. Turn them into an action log: action, owner, due time, and status. Only use owners and times that appear in the notes. If something is missing, write NEEDS OWNER or NEEDS TIME rather than guessing. List separately anything that will delay a departure today.
Three things that come up every time a depot or a transport team starts improving something.
No. Most delivery work is timestamps, a departure review and one bay fix, run by a transport planner with a Yellow or Green Belt. A Black Belt earns their place when the problem spans a network or needs designed experiments. Start with four weeks of planned versus actual departures and the constraint will usually name itself.
Start where the team already complains and you can get 30 days of gate data: late departures, trailer dwell, or damage on one lane. Avoid starting with anything that needs a new site, a fleet purchase or a carrier contract, because the first project should show a result in weeks rather than quarters.
Make the review part of the daily routine: which chart, read at what time, by whom, and what happens when it moves. Depots revert when the planner changes and the review does not. Write it into the shift handover rather than into a project report.
SimplicityHub Academy offers one of the most affordable ways to learn Lean Six Sigma and become accredited. We are an accredited training provider of the CSSC, and the White Belt is free, so you can start this afternoon.
Built by SimplicityHub® · an accredited CSSC training provider